Fabien Mangione

Publication List Details

Period

2001 - 2008

Number

19

Co-Authors

Reusable containers within reverse logistic context (2008)

Chandoul, Afif, Cung, Van-Dat, Mangione, Fabien

Due to economic and environmental constraints, many organizations have started to ship their products in reusable containers such as plastic pallets, boxes and crates. Minimizing the total flow cost...

Reusable containers within reverse logistic context (2008)

Chandoul, Afif, Cung, Van-Dat, Mangione, Fabien

Due to economic and environmental constraints, many organizations have started to ship their products in reusable containers such as plastic pallets, boxes and crates. Minimizing the total flow cost...

Ordonnancement des cellules robotisées pour une production mono-produit (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

Cette étude permet donc de calculer les cycles optimaux pour le problème des cellules robotisées. Les temps de calcul étant trop importants pour des lignes à six machines ou plus, cette méthode...

Optimal cycles for the robotic balanced no-wait flow shop (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

In a no-wait robotic flow-shop, the parts are transferred from a machine to another one by a robot and the time a part can remain on a machine is fixed. The objective is to maximize the throughput...

Three-tank hoist scheduling problem with unbounded or zero-width processing windows (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

On surface treatment lines, the products are transferred in successive tanks by a hoist. Aninteresting problem for this kind of lines is to find the hoist moves which maximise productivity. Moreover,...

Flow shop robotisé à quatre machine sans attente (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

Dans les cellules robotisées sans attente, les pièces doivent rester sur les machines pendant un temps fixe. Les pièces sont transportées d'une machine à l'autre par un robot. Un des problèmes...

Degree of the dominant cycles in no-wait robotic cells (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

In a no-wait robotic cell, we proved that the smallest degree of an optimal cycle, kappa, can take any value between 1 and (m+1)/2. We also proved that kappa can be equal to m-1 for m=4 and that...

Cycles optimaux pour des lignes de traitement de surface à trois cuves avec marges infinies ou nulles (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

Dans cette communication, nous démontrons que, pour une ligne de traitements de surface comportant trois cuves, les cycles optimaux sont des 1-cycles ou des 2-cycles, si les tolérances sur les...

Ordonnancement des cellules robotisées pour une production mono-produit (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

Cette étude permet donc de calculer les cycles optimaux pour le problème des cellules robotisées. Les temps de calcul étant trop importants pour des lignes à six machines ou plus, cette méthode...

Optimal cycles for the robotic balanced no-wait flow shop (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

In a no-wait robotic flow-shop, the parts are transferred from a machine to another one by a robot and the time a part can remain on a machine is fixed. The objective is to maximize the throughput...

Three-tank hoist scheduling problem with unbounded or zero-width processing windows (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

On surface treatment lines, the products are transferred in successive tanks by a hoist. Aninteresting problem for this kind of lines is to find the hoist moves which maximise productivity. Moreover,...

Flow shop robotisé à quatre machine sans attente (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

Dans les cellules robotisées sans attente, les pièces doivent rester sur les machines pendant un temps fixe. Les pièces sont transportées d'une machine à l'autre par un robot. Un des problèmes...

Degree of the dominant cycles in no-wait robotic cells (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

In a no-wait robotic cell, we proved that the smallest degree of an optimal cycle, kappa, can take any value between 1 and (m+1)/2. We also proved that kappa can be equal to m-1 for m=4 and that...

Cycles optimaux pour des lignes de traitement de surface à trois cuves avec marges infinies ou nulles (2008)

Mangione, Fabien, Brauner, Nadia, Penz, Bernard

Dans cette communication, nous démontrons que, pour une ligne de traitements de surface comportant trois cuves, les cycles optimaux sont des 1-cycles ou des 2-cycles, si les tolérances sur les...

Ordonnancement des ateliers de traitement de surface pour une production cyclique et mono-produit (2007)

Mangione, Fabien

Cette thèse traite des lignes de traitement de surface qui sont des lignes dans lesquelles les pièces sont immergées dans une succession de cuves. Chaque cuve contient des bains qui affectent les...

Ordonnancement des ateliers de traitement de surface pour une production cyclique et mono-produit (2007)

Mangione, Fabien

Cette thèse traite des lignes de traitement de surface qui sont des lignes dans lesquelles les pièces sont immergées dans une succession de cuves. Chaque cuve contient des bains qui affectent les...

Ordonnancement des ateliers de traitement de surface pour une production cyclique et mono-produit (2007)

Mangione, Fabien

Cette thèse traite des lignes de traitement de surface qui sont des lignes dans lesquelles les pièces sont immergées dans une succession de cuves. Chaque cuve contient des bains qui affectent les...

Ordonnancement des ateliers de traitement de surface pour une production cyclique et mono-produit (2007)

Mangione, Fabien

Cette thèse traite des lignes de traitement de surface qui sont des lignes dans lesquelles les pièces sont immergées dans une succession de cuves. Chaque cuve contient des bains qui affectent les...

Three-Tank Hoist Scheduling Problem With Unbounded Or Zero-Width (2001)

Fabien Mangione, Nadia Brauner, Bernard Penz

On surface treatment lines, the products are transferred in successive tanks by a hoist. Moreover, each processing time is nested between a minimal and a maximal duration. This constraint is called...